Skip to main content

Boeing Celebrates Groundbreaking for 777X Composite Wing Center

 

Investment of more than $1 billion will sustain thousands of Puget Sound jobs

 Boeing has celebrated the groundbreaking of its new 777X Composite Wing Center at the Everett, Wash., campus.  Permitting for the new 1-million-square-foot facility was completed approximately seven weeks earlier than anticipated, allowing for an accelerated start to construction.
Boeing is investing more than $1 billion in the Everett site for construction and outfitting of the new building.
Once completed, the facility located on the north side of the main final assembly building will help usher in composite wing fabrication for the company's newest commercial jetliner and sustain thousands of local jobs for decades to come.
"We're excited with the progress being made on this new facility that will play a crucial role in bringing the 777X to market," said Boeing Commercial Airplanes President and CEO Ray Conner. "We wouldn't be in this position without the support of our teammates and partners throughout the Puget Sound region and in Olympia – we owe them all a debt of gratitude."
Completion of the new building, which is expected in May 2016, will require approximately 3.5 million hours of work. At its peak, there will be approximately 1,200 contract employees working on the project. By the numbers, the new building will require:
  • 31,000 tons (28,000 metric tons) of steel
  • 480 miles (770 kilometers) of electrical cable
  • 80,000 linear feet (24,384 meters ) of process piping
  • 530,000 cubic yards (405,210 cubic meters) of fill material
  • 170,000 tons (154,000 metric tons) of concrete
To date, the 777X has accumulated 300 orders and commitments. Two models will comprise the 777X family – the 777-8X, with approximately 350 seats and a range capability of more than 9,300 nautical miles; and the 777-9X, with approximately 400 seats and a range of more than 8,200 nautical miles. The 777-8X competes directly with the Airbus A350-1000, while the 777-9X is in a class by itself, serving a market segment that no other airplane can. First delivery of the 777X is targeted for 2020.
 

Comments

Popular posts from this blog

Qatar Airways in Hot Water: NCAA Accuses Airline of Disregarding Nigerian Laws

 The Nigeria Civil Aviation Authority (NCAA) has slammed Qatar Airways with serious allegations of disregarding Nigerian passengers and aviation laws .  According to NCAA Director of Public Affairs and Consumer  Protection, Michael Achimugu ,Qatar Airways had  repeatedly violated regulations, notably in an incident involving a Nigerian couple traveling to the US via Doha .  A cabin crew member had accused the male passenger of misconduct during boarding in Lagos , but didn't report it then.  However, upon arrival in Doha, the accusation was made, leading to his arrest and detention for 18 hours.  The passenger, Achimugu stated  had to pay a fine and sign a document in Arabic , which he couldn't read, to secure his release and  despite this, Qatar Airways refused to let him continue his journey, forcing him to buy new tickets. The NCAA criticized Qatar Airways for ignoring their invitations and failing to respond to complaints.  The aut...

Air Traffic Controllers Suspend Warning Strike...In Crucial Meeting With NAMA Management

Normalcy has returned to the nation's airspace as  Air Traffic Controllers stepped down it warning strike which informed spacing of traffic flow by 20 minutes at four major airports in Lagos,Abuja, Portharcourt and Kano. The  suspension,according to a statement signed by the Managing Director of the Agency , Capt. Fola Akinkuotu is to allow " for a follow-up meeting between NAMA management, Director General of the Nigerian Civil Aviation Authority (NCAA) and the Association, scheduled to hold later today".  Nigerian Airspace Management Agency (NAMA) reassured airspace users and the general public that the Nigerian airspace remains safe for seamless and economic air travel.  The agency expressed regret over streaks of  inconveniences caused earlier today by the warning strike. S

ABUJA RUNWAY AND ITS MANY TROUBLES

Runway 022, Abuja remains a night mare for the foreign airlines that frequently complaints about the rutted runway surface which has caused structural damage to under carriage of most aircraft on landing. The Federal Airports Authority of Nigeria (FAAN) of recent, has been inundated with series of report from airlines like KLM, Emirates, British Airways and Ethiopian Airlines as well as some domestic carriers on the terrible nature of the runway. The poor state of the runway, if not rectified, an industry expert says may result in dangerous landing, excessive vibration, loss of control of aircraft and runway incursion on the useable portion. A committee with membership drawn from NAMA, FAAN and NCAA had come out with a suggestion of phasing the maintenance of the runway as total closure will not be possible because of political consideration. For total closure, Minna and Kaduna airports are   being considered as alternate airports. Both airports however, have ...