Skip to main content

Boeing Celebrates Groundbreaking for 777X Composite Wing Center

 

Investment of more than $1 billion will sustain thousands of Puget Sound jobs

 Boeing has celebrated the groundbreaking of its new 777X Composite Wing Center at the Everett, Wash., campus.  Permitting for the new 1-million-square-foot facility was completed approximately seven weeks earlier than anticipated, allowing for an accelerated start to construction.
Boeing is investing more than $1 billion in the Everett site for construction and outfitting of the new building.
Once completed, the facility located on the north side of the main final assembly building will help usher in composite wing fabrication for the company's newest commercial jetliner and sustain thousands of local jobs for decades to come.
"We're excited with the progress being made on this new facility that will play a crucial role in bringing the 777X to market," said Boeing Commercial Airplanes President and CEO Ray Conner. "We wouldn't be in this position without the support of our teammates and partners throughout the Puget Sound region and in Olympia – we owe them all a debt of gratitude."
Completion of the new building, which is expected in May 2016, will require approximately 3.5 million hours of work. At its peak, there will be approximately 1,200 contract employees working on the project. By the numbers, the new building will require:
  • 31,000 tons (28,000 metric tons) of steel
  • 480 miles (770 kilometers) of electrical cable
  • 80,000 linear feet (24,384 meters ) of process piping
  • 530,000 cubic yards (405,210 cubic meters) of fill material
  • 170,000 tons (154,000 metric tons) of concrete
To date, the 777X has accumulated 300 orders and commitments. Two models will comprise the 777X family – the 777-8X, with approximately 350 seats and a range capability of more than 9,300 nautical miles; and the 777-9X, with approximately 400 seats and a range of more than 8,200 nautical miles. The 777-8X competes directly with the Airbus A350-1000, while the 777-9X is in a class by itself, serving a market segment that no other airplane can. First delivery of the 777X is targeted for 2020.
 

Comments

Popular posts from this blog

Alh.Ibrahim Idrisu, Former NAMA Director of Finance &Admin Is Dead

 Former Director of Finance and Administration, Nigerian Airspace Management Agency( NAMA),Alhaji Ibrahim Idrisu is dead. Idrisu , according to family sources died on Monday evening after a brief sickness. He  will be buried later today in his home town Agbede, Etsako West Local Government Area of Edo State. Until his death,he was a senior lecturer at the National Open University of Nigeria (NOUN) Lagos Campus and lately the Deputy Director, School of Business. Idrisu,while serving at NAMA was loved by all because of his humility, dedication to duty  and above all, accessibility to staff and the general public.

Keyamo on Investment Drive in France

  The Minister of Aviation and Aerospace Development,Barr. Festus Keyamo on investment drive in France with top management staff of the Agencies and industry stakeholders, has invited private investors in that country to participate in the current move to upgrade infrastructure in Nigeria aviation sector. The four- day visit, tagged the "Nigeria France Bilateral Business Forum",  is aimed  at strengthening cooperation and explore business opportunities in the aviation sector between the two countries. A statement by Tunde Moshood, SA Media and Communications to the Minister, disclosed that Barr. Keyamo presented  a comprehensive and convincing roadmap to his hosts ,inviting them to invest in the thriving  aviation sector. On the working business trip are ; Mrs. Olubunmi Kuku, MD of FAAN, Capt. Chris Najomo, Acting Director General of NCAA, and Engr. Faruk Umar of NAMA . The delegation, according to the statement embarked on a thorough aviation business exploration across key

UAE Lifts Visa Ban on Nigerian Travelers

  President Bola Ahmed Tinubu and President of the United Arab Emirates, Mohamed bin Zayed Al Nahyan, on Monday in Abu Dhabi, on Monday finalized a historic agreement leading to the immediate lift in visa ban  on Nigerian travelers. By this emerging  agreement, both Etihad Airlines and Emirates Airlines which had ceased operation into Nigeria  are to immediately resume flight services into without any further delay. As negotiated between the two Heads of State, the immediate restoration of flight activity, by  these  airlines and between the two countries, does not involve any immediate payment by the Nigerian government. In recognition of President Tinubu’s economic development diplomacy drive and proposals today presented by President Tinubu to his counterpart, an agreed framework has been established, which will involve several billions of U.S. dollars worth of new investments into the Nigerian economy across multiple sectors, including defense, agriculture and others, by the invest